Pull Planning - Lean Construction (Subtitulos Español)

Updated: December 25, 2024

Juan Sebastián Betancourt Tabares


Summary

The video introduces lean construction and its application in planning, scheduling work, and tracking progress within the last planner system. It emphasizes the concept of pull planning, involving all parties in collaborative scheduling to eliminate waste and ensure preparedness. The process includes utilizing physical floor plans, post-it notes for trade differentiation, and a constraints sheet, aiming for a smooth flow of work and continuous improvement through monitoring, tracking progress, and capturing lessons learned.


Introduction to Lean Construction

This chapter introduces lean construction, explaining how it helps in better planning, scheduling work, and tracking progress within the last planner system.

Pull Planning Process

Explains the concept of pull planning within lean construction, emphasizing the importance of involving all parties, sending advance meeting invites, creating a collaborative schedule to eliminate waste, and ensuring everyone is prepared.

Materials Required for Pull Planning

Details the materials needed for pull planning, including items like physical floor plans, paper for schedules, post-it notes in various colors for trade differentiation, constraints sheet, and a spacious room for meetings.

Creating a Pull Schedule

Demonstrates how to create a pull schedule by working backward from the last task, identifying dependencies, durations, inspections, and task sequences to ensure a smooth flow of work and collaboration among team members.

Optimizing the Pull Schedule

Discusses the optimization of the pull schedule by refining tasks, durations, and sequences based on discussions with team members, identifying constraints, adjusting the schedule accordingly, and continually improving the planning process.

Monitoring and Adapting the Schedule

Explains the importance of monitoring the schedule, tracking progress with a plus-delta system, capturing lessons learned in each session, and using them to enhance future pull schedules for better efficiency.


FAQ

Q: What is lean construction?

A: Lean construction is an approach that focuses on better planning, scheduling work, and tracking progress within the last planner system by eliminating waste and involving all parties in the process.

Q: What is pull planning within lean construction?

A: Pull planning within lean construction involves creating a collaborative schedule by working backward from the last task, identifying dependencies, durations, inspections, and task sequences to ensure a smooth flow of work and collaboration among team members.

Q: What materials are needed for pull planning?

A: Materials needed for pull planning include physical floor plans, paper for schedules, post-it notes in various colors for trade differentiation, constraints sheet, and a spacious room for meetings.

Q: How is a pull schedule created?

A: A pull schedule is created by working backward from the last task, identifying dependencies, durations, inspections, and task sequences to ensure a smooth flow of work and collaboration among team members.

Q: How is the pull schedule optimized?

A: The pull schedule is optimized by refining tasks, durations, and sequences based on discussions with team members, identifying constraints, adjusting the schedule accordingly, and continually improving the planning process.

Q: Why is monitoring the schedule important?

A: Monitoring the schedule is important to track progress with a plus-delta system, capture lessons learned in each session, and use them to enhance future pull schedules for better efficiency.